Meyer Werft

With the undocking of the second (yet to be named) marine fuel supplier (MBV), NVL has taken another major step on the way to completion and subsequent entry into the fleet.

The 173-metre-long naval unit of the Type 707 was successfully launched last month at our MEYER WERFT, in Papenburg. As with the sister ship, final equipment, commissioning, and testing will take place at the NEPTUN WERFT in Rostock, which belongs to the Meyer Werft Group.

Enable Notifications OK No thanks