May 21, 2021 (Google Translation) – As part of the preliminary draft of the new generation aircraft carrier (PA-Ng) notified in March 2021, the General Directorate of Armaments (DGA), project owner of the program, is continuing its work on performance of the future aircraft carrier. In April, the DGA carried out maneuverability tests of the PA-Ng model at Lake Castillon…
Read MoreTag: PA-Ng
Design Work Begins on Next French CVN
March 29, 2021 (Google Translation) – On March 19, 2021, the Directorate General for Armament (DGA) notified the preliminary design work for the new generation aircraft carrier (PA-Ng) to Naval Group, Chantiers de l’Atlantique and TechnicAtome. This work, lasting two years, will make it possible to consolidate the assumptions and technical data resulting from the preliminary study phase. The construction…
Read More