Project 22350 Admiral Golovko Nearly Ready for Trials

June 2, 2021 (Google Translation) – At the second serial frigate “Admiral Golovko” of project 22350 under construction at Severnaya Verf (part of the USC), work has been completed on the installation and wiring of the bow and stern main distribution boards (MSB) and power boards from the shore.

Connecting two main switchboards will make it possible to supply power to all systems and equipment installed on the frigate, which ensure the vital activity of the order.

Now shipbuilders are aligning gearboxes, turbines, main diesel engines and shaft lines, preparing a towing device and a foam extinguishing system for delivery to the Quality Control Department. On the order, the loading and installation of products and equipment is underway, the preparation of the ship’s service rooms for sewing continues.

Project 22350 frigates are designed to perform a wide range of tasks, including destruction of surface ships, search and destruction of submarines and ground targets, anti-aircraft, anti-submarine and anti-missile defense of ships and vessels, joint actions with amphibious assault forces, patrol service, state border protection, protection of civil ships and production facilities in crisis and dangerous for navigation areas of the World Ocean.

Related posts